Certified
-
Boeing 737 - Classic 300/400 Series
Maintenance tasks up to 8C Checks in accordance with the aircraft approved maintenance program.
-
Boeing 737-8 Series
Maintenance tasks up to level 3, limited to 10.800 hours, 6.600 cycles or 36 months in accordance with the aircraft approved maintenance program.
-
Boeing 737-700 / 800 Series
Maintenance tasks up to level 3 in accordance with the aircraft approved maintenance program.
-
Boeing 767-200 / 300 Series
Aircraft equipped with GE or PW engines in accordance with the aircraft approved maintenance program.
-
CFM56-7B
Inspection and repair to top/bottom case level, including boroscope inspection, compressor blade blending, inspection, removal & installation of accessories (QEC Kit) and performance of minor repairs to the reffered engine.
-
LEAP 1B
Limited up to boroscope, removal and installation of the QEC Kit excluding the inlet cowl.